{"id":6249,"date":"2018-07-26T14:36:02","date_gmt":"2018-07-26T14:36:02","guid":{"rendered":"http:\/\/www.presto.ma\/?p=6249"},"modified":"2018-07-26T15:05:44","modified_gmt":"2018-07-26T15:05:44","slug":"construint-lexemple-de-revit-en-sis-passos-facils","status":"publish","type":"post","link":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/","title":{"rendered":"Construint l&#8217;exemple de Revit en sis passos f\u00e0cils"},"content":{"rendered":"<h5 class=\"subtitle\"><address>Document original de RIB Spain \u201cConstruyendo el ejemplo de Revit en seis pasos f\u00e1ciles\u201d<br>Traducci\u00f3 d\u2019\u00c0BAC Consultors del Vall\u00e8s\u201d<\/address><\/h5>\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_1.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6250\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_1-300x156.bmp\" alt=\"\" width=\"300\" height=\"156\" srcset=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_1-300x156.bmp 300w, http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_1.bmp 567w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>\r\n<p>Un dels objectius del BIM \u00e9s assignar al model la quarta dimensi\u00f3, \u00e9s a dir, veure\u2019l en el temps. Per a mostrar-ho, ens hem proposat construir la caseta de Revit, l\u2019exemple que s\u2019instal\u00b7la amb la versi\u00f3 2014.<\/p>\r\n<br><h2>ASSIGNAR L\u2019UNITAT D\u2019OBRA<\/h2>\r\n<p>El primer pas \u00e9s assignar la unitat d\u2019obra m\u00e9s adequada a cada fam\u00edlia i tipus del model.<\/p>\r\n<p>L\u2019ideal \u00e9s que la unitat ja estigues assignada a la llibreria de tipus, i per tant aquest pas no caldria, l\u2019\u00fanic que requereix un treball manual. Nosaltres el farem utilitzant el banc de preus de Guadalajara.<\/p>\r\n<p>L\u2019assignaci\u00f3 es realitza a Revit utilitzant el complement de Presto. L\u2019exemple cont\u00e9 36 tipus d\u2019entitats gr\u00e0fiques constru\u00efbles i l\u2019assignaci\u00f3 es realitza f\u00e0cilment en uns minuts.<\/p>\r\n<p>Malgrat s\u00f3n poques unitats d\u2019obra per a un habitatge, perqu\u00e8 l\u2019exemple no est\u00e0 complert, s\u00f3n representatives perqu\u00e8 n\u2019hi ha de tots els cap\u00edtols.<\/p>\r\n<h2>GENERAR EL PRESSUPOST<\/h2>\r\n<p>El mateix complement genera el pressupost, que cont\u00e9 140 l\u00ednies d\u2019amidament, corresponents cada una a un objecte del model. Una funci\u00f3 de Presto re-classifica les unitats d\u2019obra creant els cap\u00edtols corresponents, tal i com es veu a la imatge.<\/p>\r\n<h2>ACTUALITZAR<\/h2>\r\n<p>Per a completar la informaci\u00f3 de les unitats d\u2019obra s\u2019actualitza el pressupost amb el banc de preus de Guadalajara i s\u2019obt\u00e9 el resum, el text i el preu descompost.<\/p>\r\n<p>El pressupost de l\u2019habitatge \u00e9s de 120.000 euros, aproximadament una tercera part del pressupost real, perqu\u00e8 com hem dit no est\u00e0 complert.<\/p>\r\n<h2>PLANIFICAR<\/h2>\r\n<p>Per aquest pressupost i per a un habitatge unifamiliar Presto suggereix un termini d\u2019execuci\u00f3 de cinc mesos. Escollim sis mesos, encara que el termini suggerit per al pressupost real seria de nou.<\/p>\r\n<p>Presto crea un repartiment del pressupost en forma de campana de Gauss per a aquests sis mesos i assigna les unitats d\u2019obra a cada mes fins a esgotar la despesa. Com que els cap\u00edtols segueixen l\u2019ordre d\u2019execuci\u00f3, el resultat \u00e9s molt realista; es pot millorar reordenant les unitats d\u2019obra.<\/p>\r\n<p>Aix\u00ed obtenim les quantitats de cada unitat d\u2019obra que s\u2019executaran cada mes. Cada l\u00ednia d\u2019amidament s\u2019assigna al mes que li correspon. Quan es supera la quantitat d\u2019un mes, les l\u00ednies d\u2019amidament passen al seg\u00fcent. El resultat \u00e9s la certificaci\u00f3 previsional per mesos.<\/p>\r\n<h2>CREAR LES FASES AL MODEL<\/h2>\r\n<p>El complement de Presto crea al model de Revit sis fases, una per cada mes de construcci\u00f3, i assigna cada objecte de l\u2019habitatge a la fase que li correspon.<\/p>\r\n<h2>VISUALITZAR<\/h2>\r\n<p>Els filtres de Revit i d\u2019altres afegits pel complement permeten visualitzar cada fase a\u00efllada o amb conjunt les ja constru\u00efdes, revisar el proc\u00e9s, detectar errors del model o del pressupost i capturar les imatges per a enviar-les al client.<\/p>\r\n<p>Una funci\u00f3 del complement de Presto permet animar la visualitzaci\u00f3 i mostrar l\u2019execuci\u00f3 mes a mes amb un retard programable.<\/p>\r\n<h2>UN PROCES VIABLE I PR\u00c0CTIC<\/h2>\r\n<p>Com tots els passos anteriors, excepte l\u2019assignaci\u00f3 d\u2019unitats d\u2019obra, s\u00f3n autom\u00e0tics, el proc\u00e9s dura menys d\u2019una hora i \u00e9s escalable a obres de qualsevol grand\u00e0ria.<\/p>\r\n<p>Els procediments autom\u00e0tics aplicats es poden reempla\u00e7ar per processos m\u00e9s ajustats, per exemple, substituint la planificaci\u00f3 r\u00e0pida amb corbes S per una xarxa de preced\u00e8ncies i duracions, que ser\u00e0 necess\u00e0ria en etapes m\u00e9s avan\u00e7ades del projecte.<\/p>\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_2.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6253\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_2.bmp\" alt=\"\" width=\"184\" height=\"120\" \/><\/a> Gener\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_3.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6256\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_3.bmp\" alt=\"\" width=\"185\" height=\"130\" \/><\/a> Febrer\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_4.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6259\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_4.bmp\" alt=\"\" width=\"186\" height=\"126\" \/><\/a> Mar\u00e7\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_5.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6262\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_5.bmp\" alt=\"\" width=\"185\" height=\"134\" \/><\/a> Abril\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_6.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6265\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_6.bmp\" alt=\"\" width=\"186\" height=\"129\" \/><\/a> Maig\r\n<a href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_7.bmp\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6268\" src=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils_7.bmp\" alt=\"\" width=\"187\" height=\"140\" \/><\/a> Juny\r\n<hr \/>\r\n<div class=\"altres\">\r\n<h3>Documentaci\u00f3 en pdf&#8230;<\/h3>\r\n<h5><a class=\"pdf\" title=\"Construint l'exemple de Revit en sis passos f\u00e0cils\" href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construint-lexemple-de-Revit-en-sis-passos-f\u00e0cils.pdf\" target=\"_blank\" rel=\"noopener\">Construint l&#8217;exemple de Revit en sis passos f\u00e0cils<\/a><\/h5>\r\n<h3>Document original&#8230;<\/h3>\r\n<h5><a class=\"pdf\" title=\"Construyendo el ejemplo de Revit en seis pasos f\u00e1ciles\" href=\"http:\/\/www.presto.ma\/wp-content\/uploads\/Construyendo-el-ejemplo-de-Revit-en-seis-pasos-f\u00e1ciles.pdf\" target=\"_blank\" rel=\"noopener\">Construyendo el ejemplo de Revit en seis pasos f\u00e1ciles<\/a><\/h5>\r\n<\/div><!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Document original de RIB Spain \u201cConstruyendo el ejemplo de Revit en seis pasos f\u00e1ciles\u201dTraducci\u00f3 d\u2019\u00c0BAC Consultors del Vall\u00e8s\u201d Un dels objectius del BIM \u00e9s assignar al model la quarta dimensi\u00f3, \u00e9s a dir, veure\u2019l en el temps. Per a mostrar-ho, &hellip; <a href=\"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><!-- AddThis Advanced Settings generic via filter on wp_trim_excerpt --><!-- AddThis Share Buttons generic via filter on wp_trim_excerpt --><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[62,103,92,104],"tags":[71,72,87,57,76],"class_list":["post-6249","post","type-post","status-publish","format-standard","hentry","category-blog-ca","category-cost-it","category-notes-tecniques","category-planificacio","tag-bim-ca","tag-cost-it-ca","tag-nota-tecnica","tag-planificacio","tag-presto-ca"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construint l&#039;exemple de Revit en sis passos f\u00e0cils - Presto<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/\" \/>\n<meta property=\"og:locale\" content=\"ca_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construint l&#039;exemple de Revit en sis passos f\u00e0cils - Presto\" \/>\n<meta property=\"og:description\" content=\"Document original de RIB Spain \u201cConstruyendo el ejemplo de Revit en seis pasos f\u00e1ciles\u201dTraducci\u00f3 d\u2019\u00c0BAC Consultors del Vall\u00e8s\u201d Un dels objectius del BIM \u00e9s assignar al model la quarta dimensi\u00f3, \u00e9s a dir, veure\u2019l en el temps. Per a mostrar-ho, &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/\" \/>\n<meta property=\"og:site_name\" content=\"Presto\" \/>\n<meta property=\"article:published_time\" content=\"2018-07-26T14:36:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-07-26T15:05:44+00:00\" \/>\n<meta name=\"author\" content=\"vicens\" \/>\n<meta name=\"twitter:label1\" content=\"Escrit per\" \/>\n\t<meta name=\"twitter:data1\" content=\"vicens\" \/>\n\t<meta name=\"twitter:label2\" content=\"Temps estimat de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minuts\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/\"},\"author\":{\"name\":\"vicens\",\"@id\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/#\\\/schema\\\/person\\\/3c056e80dd8b079365b5ca5523914e68\"},\"headline\":\"Construint l&#8217;exemple de Revit en sis passos f\u00e0cils\",\"datePublished\":\"2018-07-26T14:36:02+00:00\",\"dateModified\":\"2018-07-26T15:05:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/\"},\"wordCount\":646,\"keywords\":[\"BIM\",\"Cost-It\",\"Nota t\u00e8cnica\",\"planificaci\u00f3\",\"Presto\"],\"articleSection\":[\"Blog\",\"Cost-It\",\"Notes t\u00e8cniques\",\"Planificaci\u00f3\"],\"inLanguage\":\"ca\"},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/\",\"url\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/\",\"name\":\"Construint l'exemple de Revit en sis passos f\u00e0cils - Presto\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/#website\"},\"datePublished\":\"2018-07-26T14:36:02+00:00\",\"dateModified\":\"2018-07-26T15:05:44+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/#\\\/schema\\\/person\\\/3c056e80dd8b079365b5ca5523914e68\"},\"breadcrumb\":{\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/#breadcrumb\"},\"inLanguage\":\"ca\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/construint-lexemple-de-revit-en-sis-passos-facils\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construint l&#8217;exemple de Revit en sis passos f\u00e0cils\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/#website\",\"url\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/\",\"name\":\"Presto\",\"description\":\"Gestion de co\u00fbts pour la construction\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ca\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.presto.ma\\\/ca\\\/#\\\/schema\\\/person\\\/3c056e80dd8b079365b5ca5523914e68\",\"name\":\"vicens\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ca\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g\",\"caption\":\"vicens\"},\"url\":\"http:\\\/\\\/www.presto.ma\\\/ca\\\/author\\\/vicens\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construint l'exemple de Revit en sis passos f\u00e0cils - Presto","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/","og_locale":"ca_ES","og_type":"article","og_title":"Construint l'exemple de Revit en sis passos f\u00e0cils - Presto","og_description":"Document original de RIB Spain \u201cConstruyendo el ejemplo de Revit en seis pasos f\u00e1ciles\u201dTraducci\u00f3 d\u2019\u00c0BAC Consultors del Vall\u00e8s\u201d Un dels objectius del BIM \u00e9s assignar al model la quarta dimensi\u00f3, \u00e9s a dir, veure\u2019l en el temps. Per a mostrar-ho, &hellip; Continue reading &rarr;","og_url":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/","og_site_name":"Presto","article_published_time":"2018-07-26T14:36:02+00:00","article_modified_time":"2018-07-26T15:05:44+00:00","author":"vicens","twitter_misc":{"Escrit per":"vicens","Temps estimat de lectura":"3 minuts"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/#article","isPartOf":{"@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/"},"author":{"name":"vicens","@id":"https:\/\/www.presto.ma\/ca\/#\/schema\/person\/3c056e80dd8b079365b5ca5523914e68"},"headline":"Construint l&#8217;exemple de Revit en sis passos f\u00e0cils","datePublished":"2018-07-26T14:36:02+00:00","dateModified":"2018-07-26T15:05:44+00:00","mainEntityOfPage":{"@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/"},"wordCount":646,"keywords":["BIM","Cost-It","Nota t\u00e8cnica","planificaci\u00f3","Presto"],"articleSection":["Blog","Cost-It","Notes t\u00e8cniques","Planificaci\u00f3"],"inLanguage":"ca"},{"@type":"WebPage","@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/","url":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/","name":"Construint l'exemple de Revit en sis passos f\u00e0cils - Presto","isPartOf":{"@id":"https:\/\/www.presto.ma\/ca\/#website"},"datePublished":"2018-07-26T14:36:02+00:00","dateModified":"2018-07-26T15:05:44+00:00","author":{"@id":"https:\/\/www.presto.ma\/ca\/#\/schema\/person\/3c056e80dd8b079365b5ca5523914e68"},"breadcrumb":{"@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/#breadcrumb"},"inLanguage":"ca","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/"]}]},{"@type":"BreadcrumbList","@id":"http:\/\/www.presto.ma\/ca\/construint-lexemple-de-revit-en-sis-passos-facils\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.presto.ma\/ca\/"},{"@type":"ListItem","position":2,"name":"Construint l&#8217;exemple de Revit en sis passos f\u00e0cils"}]},{"@type":"WebSite","@id":"https:\/\/www.presto.ma\/ca\/#website","url":"https:\/\/www.presto.ma\/ca\/","name":"Presto","description":"Gestion de co\u00fbts pour la construction","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.presto.ma\/ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ca"},{"@type":"Person","@id":"https:\/\/www.presto.ma\/ca\/#\/schema\/person\/3c056e80dd8b079365b5ca5523914e68","name":"vicens","image":{"@type":"ImageObject","inLanguage":"ca","@id":"https:\/\/secure.gravatar.com\/avatar\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/228125356b30d900ee86c163f8f46810d268d1f87f3736999dca28f11fa5ded1?s=96&d=mm&r=g","caption":"vicens"},"url":"http:\/\/www.presto.ma\/ca\/author\/vicens\/"}]}},"_links":{"self":[{"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/posts\/6249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/comments?post=6249"}],"version-history":[{"count":7,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/posts\/6249\/revisions"}],"predecessor-version":[{"id":6287,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/posts\/6249\/revisions\/6287"}],"wp:attachment":[{"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/media?parent=6249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/categories?post=6249"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.presto.ma\/ca\/wp-json\/wp\/v2\/tags?post=6249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}